The civic nature of our work demands a collaborative approach. The design of a building passes from abstract to specific through an orchestrated series of conscious choices, and the seven sections that follow are how H3 makes those choices, deliberately, with the client, on schedule, and on budget.

01
合作与公众参与

建筑师并非独自工作

The design of a public or institutional building is not a solo authorship. We use collaboration to externalize decisions, through workshops, reviews, and presentations rather than choices imposed on a client after the fact.

We structure communication as concentric rings. H3 and the client at the center; the consultant design team in the next ring under our direct management; stakeholder groups (leadership committees, user groups, donors, patron groups) in the next; and the broader public in the outermost ring. Each ring has its own cadence of meetings, its own communication tools, and its own role in informing the design.

Public input is paramount to the success of public projects. We have created both formal and informal engagement formats, including our Coffee and Conversation sessions, to integrate public participation in meaningful ways. We know the process is working when questions and objections become few and far between as the design progresses.

02
编程作为第一阶段

编程决定项目的命运

Our methodology begins with programming, and a direct interchange of ideas between client and architect. Programming includes charts and diagrams that graphically illustrate activities and adjacencies, supplemented by detailed information for each space: square footage, room requirements, floor heights, acoustics, natural lighting, building systems, HVAC and telecommunications, audio-visual and theatrical systems, security, and servicing.

Our consultant team reviews and verifies every programmatic activity needed to meet the goals of the facility, based on client information and our own experience in planning, designing, and constructing the relevant building type. A cost model is established at this phase and updated at every subsequent milestone, so the decisions with the largest financial consequences are made with full view of their impact, not discovered later.

03
设计即探索

Alternatives, evaluated openly

A successful design solution arises from the open consideration of credible alternatives. We explore options for master-plan layout, architectural character, space planning, circulation, material selection, mechanical approach, and service access, and we evaluate each against functional requirements, aesthetic goals, and community objectives.

我们处理每个项目时,不带任何先入为主的建筑语言。我们从社区的现有肌理和当地环境中汲取灵感。场地与功能需求在体量、开放空间及步行区域的规划中起着重要作用,但周边校园、街区或社区的建筑景观同样塑造着新建筑的建筑风格。因此,H3的每个项目最终得出的设计方案都各不相同。

04
质量控制

贯穿每个阶段的四项实践

施工文件中的不一致之处,大多出现在不同专业之间,而非同一专业内部。我们的质量保证方法旨在在这些不一致之处传达到施工现场之前将其发现。四项明确的实践方法贯穿于设计和文件编制的每个阶段。

QA · 01
Redi-Check
Internal team and consultant coordination through frequent in-person and virtual reviews, addressing the fact that most document inconsistencies occur between disciplines.
QA · 02
稳健检查
定期提交进展中的设计草图供高级团队成员审阅。在将内容最终确定到文档之前,会先对细节进行分析并交换意见。
QA · 03
新视角
由一名独立于项目团队的高级员工主导的跨学科审查,该员工经过专门培训,能够像承包商那样阅读文件。
QA · 04
翻页
在研讨会环节中,工作人员会引导决策者逐一审阅图纸,以确保随着设计工作的推进,其最初的意见和目标得以准确体现。

Together, these practices produce documents that stand up to the scrutiny of bidders, contractors, agencies, and, eventually, the people who use the building every day.

05
预算忠实度

我们对待预算中的每一美元,都如同对待自己的钱一样

Budget fidelity is our promise to the client. It begins with the recognition that the window of cost opportunity is widest at the start of a project and narrowest at the end, and that programming is therefore a cost-management activity, not an aspirational one.

随着设施规划的不断完善,我们会编制一份总项目成本模型,其中列出了所有对项目产生财务影响的类别,包括运营和维护成本;随着规划的推进,我们会将各项成本与模型中的每个要素进行对应。

We typically work with a professional cost estimator from the start, and we continually track information for design alternatives so we always have budget flexibility in hand. Priority lists are established early for items that can be designed into the project but deferred if necessary. Alternates, particularly for mechanical and electrical systems or architectural finishes, are built into the documents so that value-engineering decisions are made by design, not by attrition.

The practical effect Design intent survives the value-engineering process. The proof is in the repeat engagements, not single project cycles.
06
可持续发展

可持续发展始于现有的建筑

十五年前定义可持续设计的节能规定,如今在我们开展业务的大多数地区已成为法规强制要求。合规性已不再是差异化的关键因素。H3将可持续性视为一项分层承诺:以保护为先,以性能为基准,以适应性为长远目标。

第01层
保护即是可持续发展
The most sustainable theater is the one that is already standing. The embodied carbon in an existing cultural building is enormous, and demolishing it to build a "sustainable" replacement rarely pencils out against the carbon of new construction. H3's historic theater renewal, from the BAM Harvey to the New Amsterdam and Radio City Music Hall, is the firm's largest single sustainability contribution.
第02层
性能作为基准
Energy modeling, envelope performance, HVAC right-sizing, daylighting, low-water fixtures. We do this work to a high standard, but the standard is increasingly mandated by right. The differentiator now is integration: getting these systems to work without compromising acoustics, sightlines, or architectural intent. H3 has delivered projects from LEED Certified to Platinum where institutional clients require certification; the rigor applies whether or not the plaque is being sought.
第03层
适应性作为长远目标
A building designed to flex for fifty years of evolving program is more sustainable than a building designed for a single mission, because it stays useful. The buildings we will be asked to demolish in 2055 are the ones being designed too narrowly today. We design for the long horizon: for repurposing, for programmatic evolution, for the second and third lives that cultural buildings inevitably have.
07
配送与长久的关系

只有那栋即将启用的建筑才真正重要

我们项目管理的成效,并非取决于单个交付成果,而是取决于公司获得的跨项目重复合作项目数量。我们与布鲁克林音乐学院的合作已逾三十年,涵盖哈维剧院、玛杰斯蒂克剧院、BAMcafé以及BAM费舍尔剧院。我们与林肯中心、新观众剧院以及麦卡特剧院中心的合作,同样历经了漫长的岁月。

Construction administration is treated as a design phase, not a cleanup phase. Principals remain involved through documentation, bidding, and construction, because the difference between a good drawing set and a great building is the attention paid in the months between bid and ribbon-cutting.

This is how we work, and how we'd work with you.