Notre méthode de travail
The civic nature of our work demands a collaborative approach. The design of a building passes from abstract to specific through an orchestrated series of conscious choices, and the seven sections that follow are how H3 makes those choices, deliberately, with the client, on schedule, and on budget.
Les architectes ne travaillent pas seuls
The design of a public or institutional building is not a solo authorship. We use collaboration to externalize decisions, through workshops, reviews, and presentations rather than choices imposed on a client after the fact.
We structure communication as concentric rings. H3 and the client at the center; the consultant design team in the next ring under our direct management; stakeholder groups (leadership committees, user groups, donors, patron groups) in the next; and the broader public in the outermost ring. Each ring has its own cadence of meetings, its own communication tools, and its own role in informing the design.
Public input is paramount to the success of public projects. We have created both formal and informal engagement formats, including our Coffee and Conversation sessions, to integrate public participation in meaningful ways. We know the process is working when questions and objections become few and far between as the design progresses.
La programmation détermine l'avenir du projet
Our methodology begins with programming, and a direct interchange of ideas between client and architect. Programming includes charts and diagrams that graphically illustrate activities and adjacencies, supplemented by detailed information for each space: square footage, room requirements, floor heights, acoustics, natural lighting, building systems, HVAC and telecommunications, audio-visual and theatrical systems, security, and servicing.
Our consultant team reviews and verifies every programmatic activity needed to meet the goals of the facility, based on client information and our own experience in planning, designing, and constructing the relevant building type. A cost model is established at this phase and updated at every subsequent milestone, so the decisions with the largest financial consequences are made with full view of their impact, not discovered later.
Alternatives, evaluated openly
A successful design solution arises from the open consideration of credible alternatives. We explore options for master-plan layout, architectural character, space planning, circulation, material selection, mechanical approach, and service access, and we evaluate each against functional requirements, aesthetic goals, and community objectives.
Nous abordons chaque projet sans vocabulaire architectural préétabli. Nous puisons notre inspiration dans le tissu urbain existant d’une communauté et dans le contexte local. Le site et le programme jouent un rôle déterminant dans la conception du volume, des espaces ouverts et des zones piétonnes, mais l’image architecturale du campus, du quartier ou de l’environnement immédiat contribue également au caractère architectural d’un nouveau bâtiment. C’est pourquoi aucun projet de H3 n’a abouti à une conception identique à une autre.
Quatre pratiques, présentes à chaque étape
La plupart des incohérences dans les documents de construction se situent entre les différentes disciplines, et non au sein de celles-ci. Notre méthodologie d'assurance qualité est conçue pour détecter ces incohérences avant qu'elles n'atteignent le chantier. Quatre pratiques spécifiques sont intégrées à chaque étape de la conception et de la documentation.
Together, these practices produce documents that stand up to the scrutiny of bidders, contractors, agencies, and, eventually, the people who use the building every day.
Nous traitons chaque dollar du budget comme s'il s'agissait de notre propre argent
Budget fidelity is our promise to the client. It begins with the recognition that the window of cost opportunity is widest at the start of a project and narrowest at the end, and that programming is therefore a cost-management activity, not an aspirational one.
Au fur et à mesure que le programme d'aménagement est affiné, nous élaborons un modèle de coûts globaux du projet qui recense toutes les catégories ayant une incidence financière sur celui-ci, y compris les coûts d'exploitation et d'entretien, et nous attribuons ces coûts à chaque élément du modèle à mesure que le programme évolue.
We typically work with a professional cost estimator from the start, and we continually track information for design alternatives so we always have budget flexibility in hand. Priority lists are established early for items that can be designed into the project but deferred if necessary. Alternates, particularly for mechanical and electrical systems or architectural finishes, are built into the documents so that value-engineering decisions are made by design, not by attrition.
Le développement durable commence par les bâtiments existants
Les dispositions en matière d'efficacité énergétique qui définissaient la conception durable il y a quinze ans sont désormais imposées par la réglementation dans la plupart des territoires où nous intervenons. La conformité n'est plus un facteur de différenciation. H3 aborde la durabilité comme un engagement à plusieurs niveaux : la préservation avant tout, la performance comme base de référence, et l'adaptabilité comme objectif à long terme.
Le bâtiment qui s'ouvre est le seul qui compte
L'efficacité de notre gestion de projet ne se mesure pas à l'aune des livrables individuels, mais au nombre de contrats pluriannuels que notre cabinet a su décrocher. Notre collaboration avec la Brooklyn Academy of Music s'étend désormais sur plus de trente ans, couvrant le BAM Harvey Theater, le Majestic, le BAMcafé et le BAM Fisher. Notre collaboration avec le Lincoln Center, le Theatre for a New Audience et le McCarter Theatre Center s'est également étendue sur des périodes tout aussi longues.
Construction administration is treated as a design phase, not a cleanup phase. Principals remain involved through documentation, bidding, and construction, because the difference between a good drawing set and a great building is the attention paid in the months between bid and ribbon-cutting.